What to look for when buying a Shipping Container, for building a home
What to look for when buying a Shipping Container, for building a home.
Let’s go over a few basics. The containers are called Connex Boxes. They are constructed of a metal known as Cortin, which is very strong and rust resistant. They come in several sizes. The standard width is eight feet. There are three height options; Half Cube at four feet, Full Cube or eight feet and High Cube or nine and a half feet. As far as the length they come in 20 feet, 40 feet, and 60 feet. There are variation and custom sizes, on all of these numbers to accommodate different products.
They come insulated and not insulated. The floors are made of hard wood. The doors are standard on one end, full height.
Due to their extreme strength they are a great candidate for creative structure design. The following is personal observation and assumptions on perspective uses for housing. I am in no way an engineer or qualified to discuss structural issues of heavy construction. But I have done a lot of building and been successful. I use my own common sense and am responsible for my own failures. In other words if this article leads you to try something dangerous or foolish you’re on your own… no guarantees.
These amazing boxes are inexpensive, strong, and versatile and can be stacked in an almost unlimited array of different forms.
When buying, I look for straight boxes that have not been patched excessively with floors that are not chewed up and doors that open fairly easily and gaskets that are not shot. The person selling will tell you that you will not find one like this, but the extra time you spend on finding a straight box will pay off later.
I’ve found that you can cut in windows and doors just about anywhere you desire. You will want to have a level pad ready with access for the large semi- truck and lowboy trailer. I’d say a straight shot at least 80 feet long and 16-20 feet wide. I landed mine within 10 feet of its final destination and then a friend with a large backhoe pushed it into place. I then used a six-ton bottle jack to raise the box and used large concrete shims to set the box level. Then I poured a concrete curb for the box to rest on. Next time I’ll do all the curb work first, with deep reinforced footings that have weld plates and a copper grounding cable.
I chose the High Cube because the extra height allows room for mechanical and an insulated drop ceiling. I don’t like the insulated boxes because they are often manufactured in countries with lax material standards and so I question the spray in foam as far as environmentally and our personal health. Also some of the insulated boxes are not made of cortin and lack the structural strength to alter and stack in any way desired.
That’s the basics if you have comments, corrections to my information or any thoughts please forward.
Warmly
Mad Coyote Joe
Friday, July 22, 2011
Shipping Container Building Update

Connex Box update
As some of you know I’m interested in low cost housing. My reasoning is simple. In a world where the average American worker makes $20,000 to $35,000 a year and the average house sells for around $200,000 the average family will soon be renting instead of owning. We need an alternative that an unskilled laborer can handle; so I’m looking at Rammed Earth, Straw bale, Adobe bricks, Cast in Place Adobe, a product called Super Adobe and Connex box; also called Shipping container, buildings. I’m building a cooking school out of straw bales and a studio out of Connex boxes.

Let’s talk about the Connex box structure. I chose a decommissioned box (no longer being used for international shipping) that was 40 feet long and 8 feet wide and what is called “High Cube” 9.5 feet tall (standard boxes are 8 feet tall.) These boxes come with wooden floors and can handle a properly engineered roof load of around a half million pounds, which allows them to be stacked in interesting ways.
Foundation poured of concrete with rebar to hold fencing a center of wall
The box cast me $2700, delivered, which is cheaper and stronger than the pre-fabed sheds and garages offered currently. I use a cutoff wheel to cut in my windows and doors and if need be it can be moved.
I’m wrapping three sides in 2-inch foam for insulation and on the south side I’m attaching a 1-foot thick cast in place adobe wall.
Fencing in place, notice the scrap wood I use to hold the form at proper width
In the wall I’m adding a diaphragm of used chain link fencing in the center of the wall and attaching more 2-inch foam on the outside of this wall, for insulated thermal mass.
Rebar holding the foam, all of this had to be replaced, the wire is working fine
I had been tieing the fence to the box and the foam to the fencing, creating tension to hold the foam in place and giving me the ability to tie wire mesh at a later point for a stucco finish.
I was doing the tieing with cheap nylon twine, which is strong and wont rust like tie wire.
I drilled hundreds of hole to hold the twine. The new strapping is a much better choice
The other day I was getting some adobe poured in the forms and the chain link fencing came loose from the box. What I hadn’t planned for was the fact that the twine is not UV resistant and all of my twine had basically decomposed.
Plan B, I’m now using Plumber’s tape which is a cheap form of strapping.
This shot shows how strong the twine is and it will work well if you are not waiting to stucco
I can use a screw gun to pull the screws and then re-screw the plumber’s tape in place to hold the fencing at center wall and then I’m using galvanized wire to hold the foam in place and I can use it to attach the stucco wire later. I plan on making a living roof to finish the studio off. Please comment or ask any questions that you may have. This project is a learning lab and I will post my findings.
Tuesday, May 24, 2011
One More Link in breaking the Chain... Solar Hot Water!
One More Link in breaking the Chain... Solar Hot Water!
Free at last, free at last, Thank God Almighty (And my Friends Ed and Cory at South Face Solar Electric and Katherine Elswick!) I’m free at last! After ten days of putting all the parts together and a few months of figuring out how to rebuild and pressure test the panels and getting the different ways that water acts in a solar hot water panel set in my mind. Take all of that and then my insistence on using as many old parts as I could find around our place. Then add in the thirty or so phone calls to Ed Fedoruk (Once again Southface Solar Electric)… What do mean I need a check valve in line vertically that is on the cold feed side of the panel, but above the pump! I am now on my way to total electric bill independence.
Last year I had a few bucks so I went to Ed and Cory at Southface Solar Electric and had 7.5 KW Photovoltaic Solar Electric System installed. Our bill has dropped by about $210 a month, however I still had about a $95 a month electric bill. About the same time our friend of many years, Kathryn Elswick mentioned that she was getting her solar hot water panels replaced as one of them had failed. She offered the old panels, that were on their way to a landfill and I quickly grabbed them up. For the past three days, I’ve spent my time cleaning and cutting pipe and making the feet that are now resting on my shingle roof along with hoisting and setting the panels and cutting a path for the pipe, cutting through the wall and making sure I was following the flow path of the water.
This afternoon Kathy called on her way home as she does every day.
Ring ring, “hello”
“Hi Joe, I’m on my way home.”
“Hi Sweetie!”
“Is everything alright you sound upset?”
“No I’m okay, I just hate my fucking plumber!”
“Who’s you plumber?”
“Me.”
I was standing next to a leaking mass of pipe that were squirting water all over our dish-room. Kathy said she would get dinner and some good beer and be how in twenty minutes. By the time she got home I had all of the leaks re-soldered and tested. The leaks were fixed and the system was working I could even feel the heat coming down from the panels. Tomorrow I’m adding pipe insulation and patching all of the penetrations through the roofing material. I will set the timer for the pump and build an insulated mechanical closet around the new 80-gallon hot water storage tank. We use a lot of hot water and I’m hoping that this will drop my electric bill closer to zero. I’ll keep you posted!
Sunday, May 22, 2011
The Dogs After the Party
Last night I got home from a dinner that we were doing. I was tired. Upon walking through the door into the kitchen I found our dogs jumping up and down, barking and celebrating my arrival. There was a nice bottle of Red Zinfandel on the counter and an order of Dandan noodles from Pei Wei. Kathy was sitting on the couch and there was an old movie on the TV. I put on a pair of PJ bottoms and an old tee shirt and climbed into my favorite chair. With my feet up I enjoyed dinner and discussing my day with the party and Kathy’s day in the Kitchen at AJ’s.

The dogs wanted to be close to me. They can always tell if I’m tired or if my illness is hitting me especially hard. If I’m really hurting and cramping so bad that I have to lay down they will follow me to the bedroom and lay down next to me and push their bodies against mine in what I assume is an effort to help fight the pain. It’s quite comforting. As we watched the old movie, the dogs fell asleep on my feet, as is often the case. I had been shooting some platters that Kathy had put together for the party I was doing and my camera was next to my chair so I snapped these shots.
I believe in common things; a nice home, a pick-up truck, a nice grill, a few good dogs, an old movie and of course a little time with my wife and lifelong friend Kathy… life is good!
Tuesday, April 12, 2011
Home A Poem by Daigneault
I woke again this morning
Our home was still the same
Yes we had our clutter
Our address had not changed
And though the trees still knew me
There was something in that air
A joy rose with the morning
and old things now seemed rare
My years now more than fifty
with dull eyes became clear
That this is all I’ve needed
Our home the people here
With luck as I walk forward
With Kathy through the years
We’ll have all we’ve needed
In our little home right here
Friday, February 25, 2011
Coments are King!
Comments are king if you are enjoying these posts you cane help us. My partner in this TV venture Raul Odonnel said to me the other day “Comments are king!” Raul is right if you feel anything, right, wrong or indifferent, please let us know. It guides us and tells us we are giving you something that you are reading and hopefully enjoying. Either way, let us know and we will respond!
Wednesday, February 2, 2011
Shipping Container Building
Shipping Container Building

One of the goals we have in building our campus is to use our different buildings as individual labs, the buildings themselves. The goal being to discover ways for the average person on the street to build their own home or what ever other buildings they may need, at the lowest possible cost, and with the greatest future savings of energy.
What we’re studying is Shipping Container (Connex Box), Straw Bale, Cast in Place earth, and super insulated frame, Construction. Along with this we are implementing photovoltaic electric and passive solar hot water.

I am currently working on the utility building that will house our art studio, mechanical workshop, storage and potting shed. Its frame is a shipping container. Known as a “High Cube” it is forty feet long, nine and a half feet tall and eight feet wide.

These come with utility grade, hard wood floors and are strong enough to stack eight high fully loaded. What that means to us is they can handle almost any load that the average builder might want to place on top of their building.

These Connex boxes are made out a product called “Corten” also known as weather resistant steel. There are several builders worldwide thinking up new and unusual ways to stack these structures. After looking at several boxes, our criteria being; straight, without major holes or dents, minimal corrosion, floors in good shape, doors with good seals and in good working order and weather tight, we bought ours for $2700 delivered. A friend moved it into place with a backhoe and I leveled it with a 6-ton jack. I cut in the window for light and placed a vent on the roof. Our future plans include adding thermal mass with poured in place, reinforced adobe, wrapping the finished box with two inches of insulation and a living roof that will serve as an herb garden and possible second story office. This is one or most requested blog subjects we receive. Please let us know what you’re building needs and plans are. And if we can lab something or help answer any questions that you may have. I just grabbed these pics of the net as examples of box construction.
Warmly,
Mad Coyote Joe
Friday, January 28, 2011
Willie (ongoing blog chapters saga)
This is the first part of the chgapter "Puke and Weeds" I posted a few days ago. Let me know what you think.
Willie
By
Joe Daigneault
Creative Writing
Life is hard. My father tried to protect me from the world, but also knew that one day I would have to stand up and fight. My life up to that point was one of swimming pools, ice cream and ponies. I was thirteen years old and the hardest thing I had ever encountered was not being chosen for basketball or loosing at monopoly.
I was sitting, in the living room, on the big brown couch, with my father, watching television. Most of my friends had paper routes and always had pocket money. I wanted a summer job.
“Dad”
“Yes son”
“I was wondering if you might have some work for me?”
“Well, we could use someone picking up the wire down at the fab yard.”
My father owned a rebar fabrication yard in South Phoenix. Rebar is, sort of, the skeleton of a concrete building or structure. In the office, detailers take the architectural drawings and figure out what load and stresses will be on the various components of the building. They design a rebar frame that is engineered to meet that load. They create a set of plans and cut sheets that list the quantities and various lengths or shapes needed to build the columns, beams or floors in the high-rises, bridges, dams, power plants or whatever is being built. The fab yard then takes stock lengths of rebar, cuts and bends it into the required lengths and shapes. It is then loaded onto trucks and shipped out to the construction site.
I remember thinking ‘how hard could that be?’
I said, “Thanks dad, that would be great!”
“Okay Joey, get some sleep and I’ll wake you up. We leave at four.”
“Four!” I had never got up that early. “What time do they start?”
“At five, it gets hot early”
The next morning while we were riding to work, he gave me a little talk.
“Joey these guys are real men, they don’t screw around. They don’t want to be your friend; they just want to get the work done.” He went on, “It’s been my experience that in life there’s always a whip. It will either be in your boss’s hand or in your own head. Trust me it’s a lot easier if you hold the whip.”
We got out of the car on the oil-covered dirt road in South Phoenix’s old industrial district. I was sticky and sweating and the sun wasn’t even up yet. There’s a smell in that part of town, chemical, steel, iron, dirt, sweat, and the smell of years of men working on the same piece of sun-baked ground.
A few minutes later an old truck pulled up and a short unassuming man in his mid-forties got out. He was wearing a faded yellow cowboy shirt and had a friendly little smile on his face.
Yawning and stretching he mumbled, “Morning Joe”
“Good morning Chuck, Joey this is Mr. Reeves.
“Good morning Mr. Reeves.”
“You can call me Chuck, Joey, It’s nice to meet you”
Then my dad asked if I had any money. I said, “no”.
“Well, here’s a few bucks, A truck will come around at nine and then again at noon. The foods not too bad. Don’t eat too much in this heat, it will make you sick. I’ll pick you up at two.” He knew I was a little nervous and added, “Just do what Chuck tells you… you’ll be fine!” Then he got back in his car. Chuck and I watched as he drove down the street to the old two-story, red brick house that served as his office.
As soon as he was out of sight, Chuck turned to me. The kindly look on his face had disappeared. With more anger than I had ever encountered, staring a hole right through me, he screamed, and he did so without raising his voice.
“Listen to me you little mother fucker, your daddy might have gotten you this god damn job, but he can’t keep it for you. Where are your fuckin hand shoes?”
“What?” I squeaked out.
“Your hand shoes… your gloves, goddamn it! You little son of a bitch, you show up on my time without your fucking tools. Ya know, I don’t give a rat’s ass… when your hands look like raw fucking hamburger go whine to someone else. Are you going to stand here bullshitting all day or are you here to work?”
I tried to answer but before I could he went on,
“I want every fuckin piece of wire in that yard in that dumpster before the end of the day.
In the fab yard they received up to ten trucks loaded with forty thousand pounds of steel each, every day. The bundles are tied together with rusty wire called bundle wire. It’s as thick as a pencil, so thick I couldn’t even bend it. All this wire is cut off the bundles and tossed into piles, after the cutting and bending the rebar is retied into smaller bundles and shipped to the job site. Wire is the lifeblood of a steel yard. Needless to say it would be impossible for one person, let alone a thirteen-year-old boy, to keep ahead of the piles and piles of rusty wire generated everyday.
I had no idea what I had done to make Chuck so mad, and I didn’t want to find out. I started picking up wire as fast as I could. The bundle wire looks like big spiders about a foot across and the tips of the legs are razor sharp. They get all tangled together and I had too pull as hard as I could to get them free. On the second or third bunch, as it broke loose it sliced deep into the palm of my hand. The blood oozed, and I howled, “I’m cut, I’m cut… Chuck help, help!!! I’m cut.” Chuck came running over.
“Let me see… Well shit boy you aren’t hurt, what kind of a pussy are you? You aren’t fuckin lucky enough to die… Get your ass back to work!”
I was crying, scared to death and quite sure I would need stitches, when the biggest man I had ever seen walked over and handed me a brand new pair of White Mule leather work gloves.
He was about six two, two hundred and fifty pounds, not a drop of fat with reddish blond hair, a sunburned face and steel grey eyes. He stuck out his huge hand and as he grabbed mine he smiled and said “Hey kid, give those a try… my names Willie!”
Friday, January 14, 2011
Shipping Container Houses
Shipping Container houses
My interest was in building a second home for Kathy and myself or a home for one or both of our children. Drywall can be screwed to the interior walls and foam glued to the exterior providing a strong, well insulated structure. I wanted to add mass so I decided on using a system that I have been working on in my landscape for the past few years. I have been building walls out of cast in place adobe.
I use just plain old dirt out of my yard. I mix water into the dirt, in a wheelbarrow and pour it into a form. This is placed on a concrete foundation that comes above the ground by about five inches to create a break between the earth for reasons of termites and water. Once the mud sets up I remove the forms and move them up, for the next pour. The earth, dried in this Arizona sun, is rock hard. After the walls are finished I drive ring-shank nails into the adobe to hold stucco netting and then cover it with a coat of fiber-strengthened stucco. The end result is massive, bullet proof (literally) and very inexpensive.
In applying this to shipping container construction I am adding a two-inch layer of foam used both as a form and as future insulation.
As with my walls I’m placing a vertical layer of recycled chain link fencing to add both reinforcement and a structural diaphragm.
I’m tying this to the box along with running a nylon twine to the exterior of the foam for stucco wire connection. I chose the twine over tie wire as wire can both stretch and rust, twine will do neither. The end product will be a layer of insulation, which I run down below grade about eight inches to create a thermal break from the brutal Arizona sun.
Then I have one foot of adobe for mass and then the box it’s self. I plan on doing a living roof. Please ask any questions or leave any comments that you might have.